next prev
x

Infused with new life

In the middle of the trendy Zurich-West quartier a hotel underwent a total restoration in 12 months. Huber Fenster AG supplied the wood/metal windows. The oak was treated with a pigmented oil, producing a smoked-oak effect inside. The windows form the actual façade, in front of which elements made of concrete and brick were arranged, exuding a modern and timeless feel. Because of the heights of the rooms, the split windows, and the balcony doors, the rooms offer lovely views. All windows are flush-mounted inside and out, with fixed glazing at the bottom and tilt-turn at the top, thanks to a sash.

media report Hochparterre 09/18 (German)

Photo: Roman Keller, Zürich

Project
Hotel Züri by Fassbind Hotel
Completion
1980
Restoration
2016/2017
Architect
ANNETTE GIGON / MIKE GUYER DIPL. ARCHITEKTEN ETH/BSA/SIA AG
Product
Wood/metal windows, flush-mounted inside and out, balcony doors
Material
Oak (oiled with pigmented oil)
This Huber Fenster product was produced sustainably.
Project 67 | 113

Infused with new life

In the middle of the trendy Zurich-West quartier a hotel underwent a total restoration in 12 months. Huber Fenster AG supplied the wood/metal windows. The oak was treated with a pigmented oil, producing a smoked-oak effect inside. The windows form the actual façade, in front of which elements made of concrete and brick were arranged, exuding a modern and timeless feel. Because of the heights of the rooms, the split windows, and the balcony doors, the rooms offer lovely views. All windows are flush-mounted inside and out, with fixed glazing at the bottom and tilt-turn at the top, thanks to a sash.

media report Hochparterre 09/18 (German)

Photo: Roman Keller, Zürich

Project
Hotel Züri by Fassbind Hotel
Completion
1980
Restoration
2016/2017
Architect
ANNETTE GIGON / MIKE GUYER DIPL. ARCHITEKTEN ETH/BSA/SIA AG
Product
Wood/metal windows, flush-mounted inside and out, balcony doors
Material
Oak (oiled with pigmented oil)